![]() The use of drones also eliminated hazards associated with working on a fragile roof. Ground penetrating data, laser scan data and drone surveys were used to create a highly accurate model of the new plant design. ![]() A digital model that fully integrates all civil, mechanical, electrical and process design.This enabled high levels of collaboration across the supply chain, from project management to engineering, procurement to operations. A Common Data Environment stored all design information in the cloud, instead of a local server. Creating a single source of information.Wessex Water worked with Aecom to introduce a digital strategy to bring a range of technologies and innovations to form a comprehensive digital engineering approach to the scheme and wider business. Furthermore, with the plant providing drinking water for 40,000 people in Somerset, it was crucial for it to be of the highest quality possible. This was necessary due to the complexity of the site, where there were numerous existing underground services to be modelled. That meant the use of collaborative 3D models with embedded digital versions of all project and asset information, documentation and data. Wessex Water’s project to reconstruct Durleigh was its first scheme to be delivered to BIM Level 2. This would be together with integrating the design elements undertaken by others. Wessex Water appointed Aecom as one of the six Tier 1 Design Capital Delivery partners to undertake the detailed design of the civil engineering and mechanical and industrial engineering (M&IE) works. This would be replaced with a new main treatment building with processes for DAF and rapid gravity filters, manganese filters and a new low-lift pumping station. This would remove an admin building, a dissolved air flotation (DAF) plant and sand filters. The plan entailed demolishing all the existing structures at the north end of the site. ![]() The upgrade would enable Wessex to consistently and safely deliver 30 million litres of water a day while addressing concerns over deteriorating raw water quality and the presence of pesticides and manganese. Wessex Water and Aecom used Igloo Vision’s Shared VR technology to improve teamwork and save £300,000 in costs on the reconstruction of the Durleigh Water Treatment Centre near Bridgwater in Somerset.Īs its flagship scheme (and an important part of its current asset management plan), Wessex Water had planned a £50m upgrade of the Durleigh Water Treatment Centre.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |